- The terminal is a part of the Mumbai - Ahmedabad High-Speed Rail (MAHSR) Corridor, which is scheduled to be completed by 2028.
- The terminal was revealed by Railway Minister Ashwini Vaishnaw.
- The project, a collaboration between India and Japan, is designed to connect Ahmedabad and Mumbai in approximately 2.07 hours, with a maximum design speed of 350 km per hour.
- The total cost of the project is estimated to be around Rs 1,08,000 Crore, with 81% of the cost being covered by a Japanese soft loan at a minimal interest rate of 0.1% per annum.
Question:
Q.1 Where is India’s first bullet train terminal located?a. Mumbai
b. Delhi
c. Ahmedabad
d. Kolkata