- This event took place at 11:30 AM on January 27, 2024.
- The river diversion will enable isolation of the dam area at the river bed, which is a critical step for starting the excavation and construction of the dam.
- This move is expected to expedite project construction activities and help in minimizing delays, facilitating all efforts to meet the scheduled commissioning date of May 2026.
- The Ratle Project is being executed by Ratle Hydroelectric Power Corporation Limited (RHPCL), a Joint Venture of NHPC Limited and the Government of J&K, with a shareholding of 51:49 percent, respectively.
- The project was sanctioned by the Cabinet Committee on Economic Affairs in January 2021, at a total cost of Rs. 5281.94 crores.
Question:
Q.1 Which river was diverted for the Ratle Hydro Electric Project?a. Jhelum River
b. Indus River
c. Chenab River
d. Ravi River