- These projects aim to improve logistics efficiency, reduce congestion, and enhance connectivity across the country.
- Here are some key highlights:
- Agra-Gwalior Corridor: An 88-km, 6-lane access-controlled corridor to reduce travel time by 50%.
- Kharagpur-Moregram Corridor: A 231-km, 4-lane corridor to boost connectivity between West Bengal and the North-East.
- Ayodhya Ring Road: A 68-km, 4-lane ring road to ease congestion and facilitate faster travel to Ayodhya.
- Kanpur Ring Road: A 47-km, 6-lane section to complete the ring around Kanpur.
- Guwahati Ring Road: A 121-km ring road to improve connectivity in the North-East.
- Tharad-Ahmedabad Corridor: A 214-km, 6-lane corridor to enhance connectivity in Gujarat.
- These projects are expected to generate around 4.42 crore man-days of employment.
Question:
1 What is the total investment approved by the CCEA for the development of eight high-speed road corridors?
- A) 40,000 crore
- B) 50,655 crore
- C) 60,000 crore
- D) 70,000 crore