- This ambitious project aims to transfer water from the Ken River to the Betwa River.
- The primary objectives are to provide irrigation to 1.08 million hectares of land, supply drinking water to approximately 6.2 million people, and generate 103 MW of hydropower and 27 MW of solar power.
- The project, which spans the states of Madhya Pradesh and Uttar Pradesh, is expected to significantly boost agriculture, alleviate water scarcity in drought-prone regions, and enhance the overall socio-economic development of the area.
Question:
1 What is the primary aim of the Ken-Betwa River Link Project?
- A) Industrial development
- B) Urbanization of rural areas
- C) Water transfer from the Ken River to the Betwa River
- D) Forest conservation