- The agreement was signed on February 3, 2025, and it aims to provide 200 kW Renewable Energy Round-the-Clock (RE-RTC) power for a period of 25 years.
- Key Highlights:
- Project Location: Chushul, Ladakh, at an altitude of 4,400 meters, where winter temperatures can drop to -30°C.
- Objective: To replace the Army’s existing diesel generator sets, eliminating fossil fuel logistics and reducing carbon dioxide emissions by 1,500 tons per year.
- Benefits: The project will contribute to the decarbonization and modernization of the defense sector in border regions of the Himalayas.
Question:
1 What is the primary objective of the Power Purchase Agreement (PPA) signed between NTPC and the Indian Army for the solar-hydrogen microgrid in Chushul, Ladakh?
- A) To reduce the cost of electricity in Ladakh
- B) To develop a new fossil fuel-based power generation system
- C) To supply electricity to civilian areas of Ladakh
- D) To replace the Army’s diesel generator sets with renewable energy