Current context: Kolkata Metro Rail Corporation (KMRC) said that India's first underwater metro train service is expected to be completed by March 2022.
a. North-East Metro project
b. East-West Metro project
c. South-West Metro project
d. North-South Metro project
- The underground Metro Project is known as the East-West Metro project, which is being constructed below the Hoogly River.
- The underwater metro twin tunnel will connect Howrah and Mahakaran Stations.
- The East-West Metro corridor builds under the Government of India entity Kolkata Metro Rail Corporation (KMRC) will have 6 elevated stations and six underground stations.
- The length of the river crossing is 520 metres and the internal diameter of each tunnel is 5.55 metres.
- The total estimated cost of the Kolkata East-West Metro Corridor Project is Rs 8,996.96 crore.
- About 48.5% of the fund is provided through a soft loan of Rs 41.6 billion from the Japan International Cooperation Agency (JICA).
- KMRC will repay the JICA loan over 30 years after an initial six-year moratorium.
- The East-West Metro project is 74% owned by India’s Railway Ministry and 26% by Ministry of Housing and Urban Affairs.
Question:
Q.1 India’s first underwater Metro train service is named as _________________?a. North-East Metro project
b. East-West Metro project
c. South-West Metro project
d. North-South Metro project