- The primary objective of this web portal will be to promote and enhance affordable, reliable, sustainable clean, and green energy sources.
- This is in line with the Electricity (Promoting Renewable Energy through Green Energy Open Access) Rules 2022, which was brought by the Ministry of Power in June 2022.
- The Power System Operation Corporation Limited (POSOCO) designed and developed the portal.
- The stakeholders viz. traders, power exchanges, open access participants, Central/State transmission utilities, etc. will be able to access the web portal to process green energy open access applications.
- It will allow any consumer with a load limit of 100 kW to access green power through a transparent and uniform procedure.
- The portal will assist in providing the approval for green energy open access for the stakeholder in a time-bound manner (15 days).
Question:
Q.1 The recently launched Green Energy Open Access Portal will allow consumers having a sanctioned load of ______ or above to get a supply of renewables.a. 100 kW
b. 250 kW
c. 500 kW
d. 1000 kW