.png)
- The project is part of a 33.7 km Greenfield Corridor, featuring a 15.79 km twin‑tube tunnel.
- It will connect Gohpur (NH‑15: National Highway‑15) with Numaligarh (NH‑715: National Highway‑715).
- Travel distance will reduce from 240 km to 34 km, cutting travel time from 6 hours to 20 minutes.
- The estimated cost is ₹18,662 crore, making it one of India’s most ambitious infrastructure projects.
- Significance: Enhances Northeast connectivity, boosts freight efficiency, and supports regional economic growth.
Question:
Q.1 The Brahmaputra Underwater Road-cum-Rail Tunnel will be constructed under which river?a) Ganga
b) Yamuna
c) Brahmaputra
d) Godavari
Answer: c) It will be India’s first transport tunnel constructed beneath the Brahmaputra River.